Permeable Reactive Barrier Work Plan

Ford Motor Company has announced the following work plan for the construction of the Permeable Reactive Barrier (PRB) that will be installed on the former Visteon plant property near the northwest corner of the Manors at Central Park Condominiums:

  • Week of Oct 28th - locate underground utility lines and clear away brush.
  • Week of Nov 4th - begin delivery of equipment and materials; excavate and remove abandoned underground utility lines in the vicinity of the PRB
  • Week of Nov 11th – DeWind (Ford's subcontractor) will begin the trenching and installation of the PRB. They anticipate having the work completed by Thanksgiving and during this portion of the work plan DeWind will be working 7 days per week.  Actual construction work will be limited to the daylight hours.
(click to enlarge)

The approximate location of the PRB is indicated by the red line in the aerial view above. The PRB will be located on the other side of the landscaped berm behind the units at 50087 through 50167 Lexington West. All of this construction work will take place on the former Visteon plant property, not on the Manors' side of the fence.  Manors residents might be able to hear the equipment when work is underway but they will not be able to see any of this work unless they are standing on top of the berm.

Wednesday, October 2, 2013

Road and access drive closures for seal coating

UPDATE (2:30 PM, Oct 3rd):
The last of the seal coating was applied at 1:00 PM this afternoon.  The work was completed early enough that any rain later this afternoon or evening will not negatively affect the coating. The contractor advised us to keep the roadways closed to traffic until 1:00 PM Friday afternoon.  This will give the coating enough time to bond to the asphalt surface and resist marking from tires.  
---------------------------------------------------

DCAM, INC. has scheduled the remaining asphalt seal coating work for tomorrow, Thursday, Oct. 3rd  beginning at 8:00 AM (weather permitting).  They will be applying seal coat material to the private access drives in front of 6915-7355 North Central Park (Units 1-22), the Walter Ct. stub street and also in the roadway in front of 6958-6980 Lexington South (Units 166-167).  

Do not walk on the fresh seal coat unless you first check and confirm that it is dry to the touch, which depending on the weather might take several hours after it is applied.

Parking and vehicular traffic will not be allowed on these affected roadways beginning at 8:00 AM Oct 3rd and ending at 8:00 AM Oct. 4th (or earlier, depending on temperature and humidity levels).  Please do not remove or drive around any “CAUTION” tape.

Residents at the addresses listed above must park their vehicle(s) out on either North Central Park, East Broadway or on Lexington South (west of 6936 Lexington South) prior to 8:00 AM on Oct. 3rd or risk the possibility that they will be towed or trapped in their garage or driveway for most of the day and evening.

No parking is allowed on West Broadway between North Central Park and Lexington South at any time.  

Seal coating cannot be applied if there is a risk of rain prior to the estimated time that the seal coating would be fully dried to the touch.  Rain will cause the fresh coating to wash off and congeal into messy clumps that not only would have to be removed but which could also get into the storm water system and into our retention ponds.

Therefore, if there is a threat of rain for Thursday, this work will be postponed and rescheduled for Wednesday, Oct. 9th.   If necessary, an e-mail blast will be sent out to those on my Manors e-mail distribution list prior to 8:00 AM Thursday morning, announcing the postponement; the announcement will also be posted here on the Manors Blog. If there is a chance of rain on Oct. 9th, the same postponement notification procedure will be repeated.