Sunday, June 22, 2014
Soil Sampling
Beginning on June 25, 2014, crews from McDowell and Associates will be occasionally on-site to perform soil analysis to confirm the limits of the previously-detected groundwater contamination near the northwest corner of our property. They will be sampling at four different locations along the berm at points north of 49943 Lexington Ave. West and west of 6829 Lexington Ave. North. Their work should be completed within two weeks.
Labels:
contractors,
groundwater