The water meters for the sprinkler system zones were installed on April 25th. H2O Irrigation Inc. began work the following week to test each zone and make necessary repairs to broken heads. During this process, Shelby Township inspectors red-tagged two of the meters and stopped all work until we made changes to the valve arrangements on our side of those two meters. Those changes were made on May 8th and H2O is scheduled to return on May 12th and 13th to complete the start-up work.
Due to the insistence of the Shelby Twp. water department that we revise valving that had already passed their inspection in 2004, we have incurred additional work and expenses that have delayed the system start-up by more than a week. The sprinkler systems should be functional by May 14, 2008.
A well has been drilled at the base of the berm near the intersection of Regent and Lexington North. Once completed, this will be used to supply irrigation water for the grass and trees on the berm in the northwest quadrant of the site. This will result in a significant savings on our municipal water billings.