Stage 1: On
Monday, Sept. 16, 2013, DCAM will be performing pothole patching using a
compacting roller machine and hot mix asphalt to repair several areas where the
original top layer of asphalt has deteriorated.
These locations are scattered along the private access drive in front of
6915-7011 North Central Park and also in the
roadway in front of 6958-6980 Lexington South.
Parking will not be allowed on these affected roadways
beginning at 7:00 AM on Sept. 16th until after the repair work is
completed. Traffic on these affected roadways will be blocked during the short
period while the work is being performed since the workers will have the
affected roadway blocked with their equipment.
The patches will be able to be driven on as soon as the crew leaves.
The Board of Directors recommends that residents of these
affected units park their vehicle(s) out on North Central Park and to the west
on Lexington South if they will need to use their car on the 16th after 7:00 AM and prior to the completion of
the repairs. No parking is allowed on
West Broadway between North Central Park and
Lexington South. DCAM says that they will likely start this work early in the
morning of the 16th but they cannot promise a start time. In the case of a threat of rain, this work
will be postponed and the Manors Blog will provide an update on when work will be rescheduled.
Stage 2: On Friday, Sept. 27, 2013 (weather
permitting), DCAM will be on-site to clean and fill cracks in all of our roads
and access drives with a hot rubberized tar. No parking is allowed on any street or access
drive that day, beginning at 7:00 AM and expiring after the work crew has
passed by. Each roadway will be closed to traffic during the short period that
the roadway will be blocked by the workers and their equipment. Please avoid driving over the freshly-applied
tar strips for the first half-hour or so to avoid any damage to your vehicle
and/or the tar strips. In the case of a threat of rain, this work will be
postponed and the Manors Blog will provide an update on when work will be rescheduled.
Stage 3: On Thursday, Oct. 3, 2013 (weather
permitting), DCAM will be on-site to apply seal coat material to the private
access drives in front of 6915-7355 North Central Park (Units 1-22), the Walter
Ct. stub street and also in the roadway in front of 6958-6980 Lexington South
(Units 166-167). Parking and vehicular
traffic will not be allowed on these affected roadways beginning at 7:00 AM Oct
3rd and ending at 7:00 AM Oct. 4th. You must park your vehicle(s) out on North Central Park and to the west on Lexington South prior
to 7:00 AM on Oct. 3rd or risk the possibility that it will be
trapped in your garage or driveway for most of the day and evening. No parking
is allowed on West Broadway between North Central Park
and Lexington South. In the case of a
threat of rain, this work will be postponed and the Manors Blog will provide an update on when work will be rescheduled.
This work is the final phase of the asphalt paving project
and is being funded from the Special Assessment that was levied in 2012. Your
cooperation is appreciated.
Sincerely,
The Board of Directors of the Manors at Central
Park Condo Association